Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Pass SAP C-TS422-1909 Exam With Practice Test Questions Dumps Bundle [Q24-Q39]

Share

Pass SAP C-TS422-1909 Exam With  Practice Test Questions Dumps Bundle

2021 Valid C-TS422-1909  test answers & SAP Exam PDF


SAP C-TS422-1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 2
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 3
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 4
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA
Topic 5
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 6
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
Topic 7
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions
Topic 8
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 9
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 10
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components


C-TS422-1909 Exam Certification Details:

Cut Score:55%
Exam:80 questions
Level:Associate
Languages:German, English, French, Chinese
Sample Questions: SAP C-TS422-1909 Exam Sample Question
Duration:180 mins

 

NEW QUESTION 24
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. High product complexity
  • B. Low product stability
  • C. Low product complexity
  • D. High product stability

Answer: C,D

 

NEW QUESTION 25
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Which material master views can be maintained
  • B. Whether material numbers are assigned internally or externally
  • C. Which transaction you can use to create a new material
  • D. Whether a material master field is required, changeable, displayed, or hidden

Answer: A,D

 

NEW QUESTION 26
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

  • A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Add the agreement to the source list and mark it for MRP relevance.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: A,C

 

NEW QUESTION 27
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Adjust the available capacity.
  • B. Reduce the planning window.
  • C. Select an alternative mode on a resource.
  • D. Form optimum sequences to reduce setup times.
  • E. Execute a new production planning run.

Answer: A,C,D

 

NEW QUESTION 28
During production order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Lot size or material cost
  • B. Validity period or sales order
  • C. Planned order or material number
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 29
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Individual/Collective Indicator
  • B. Storage Location MRP Indicator
  • C. Mixed MRP indicator
  • D. Dependent Requirements indicator

Answer: C

 

NEW QUESTION 30
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the reorder point.
  • B. Use the minimum order quantity.
  • C. Use the fixed lot size procedure.
  • D. Use the MRP type for vendor managed inventory.

Answer: C

 

NEW QUESTION 31
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse order
  • B. Outbound delivery order
  • C. Outbound delivery request
  • D. Warehouse task

Answer: C

 

NEW QUESTION 32
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements type
  • B. Order type
  • C. Consumption sequence procedure
  • D. Requirements profile

Answer: A

 

NEW QUESTION 33
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Total replenishment lead time
  • B. Float after production
  • C. Setup time
  • D. Planned delivery time

Answer: B,D

 

NEW QUESTION 34
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:

  • A. SAP Sales Support replaces SAP CRM
  • B. SAP GTS replaces ERP SD Foreign Trade
  • C. Settlement Management replaces ERP SD Rebates
  • D. SAP Revenue Accounting replaces ERP SD Revenue Recognition
  • E. SAP order Fulfillment replaces ERP SD Availability Checking

Answer: B,C,D

 

NEW QUESTION 35
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Production cost collector
  • B. Repetitive manufacturing profile
  • C. Production version
  • D. Routing

Answer: C,D

 

NEW QUESTION 36
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:

  • A. By creating routings with parallel sequences
  • B. By assigning the same production version to different materials
  • C. By creating routings with alternative sequences
  • D. By assigning different materials to the same routing

Answer: D

 

NEW QUESTION 37
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order's components are copied from the picking list.
  • B. The planned order's component availability is checked
  • C. The planned order is converted to a production order.
  • D. The planned order generates capacity requirements.

Answer: D

 

NEW QUESTION 38
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:

  • A. SAP MaxAttention
  • B. SAP Best Practices
  • C. Guided Configuration
  • D. Premium engagement

Answer: B,C

 

NEW QUESTION 39
......

Top SAP C-TS422-1909 Courses Online: https://www.vce4dumps.com/C-TS422-1909-valid-torrent.html