
Pass SAP C-TS422-1909 Exam With Practice Test Questions Dumps Bundle
2021 Valid C-TS422-1909 test answers & SAP Exam PDF
SAP C-TS422-1909 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
C-TS422-1909 Exam Certification Details:
| Cut Score: | 55% |
| Exam: | 80 questions |
| Level: | Associate |
| Languages: | German, English, French, Chinese |
| Sample Questions: | SAP C-TS422-1909 Exam Sample Question |
| Duration: | 180 mins |
NEW QUESTION 24
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product complexity
- B. Low product stability
- C. Low product complexity
- D. High product stability
Answer: C,D
NEW QUESTION 25
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Which material master views can be maintained
- B. Whether material numbers are assigned internally or externally
- C. Which transaction you can use to create a new material
- D. Whether a material master field is required, changeable, displayed, or hidden
Answer: A,D
NEW QUESTION 26
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
- A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- B. Add the agreement to the quota arrangement and mark it for MRP relevance.
- C. Add the agreement to the source list and mark it for MRP relevance.
- D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Answer: A,C
NEW QUESTION 27
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Reduce the planning window.
- C. Select an alternative mode on a resource.
- D. Form optimum sequences to reduce setup times.
- E. Execute a new production planning run.
Answer: A,C,D
NEW QUESTION 28
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Lot size or material cost
- B. Validity period or sales order
- C. Planned order or material number
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION 29
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Individual/Collective Indicator
- B. Storage Location MRP Indicator
- C. Mixed MRP indicator
- D. Dependent Requirements indicator
Answer: C
NEW QUESTION 30
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the reorder point.
- B. Use the minimum order quantity.
- C. Use the fixed lot size procedure.
- D. Use the MRP type for vendor managed inventory.
Answer: C
NEW QUESTION 31
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Warehouse order
- B. Outbound delivery order
- C. Outbound delivery request
- D. Warehouse task
Answer: C
NEW QUESTION 32
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements type
- B. Order type
- C. Consumption sequence procedure
- D. Requirements profile
Answer: A
NEW QUESTION 33
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Float after production
- C. Setup time
- D. Planned delivery time
Answer: B,D
NEW QUESTION 34
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:
- A. SAP Sales Support replaces SAP CRM
- B. SAP GTS replaces ERP SD Foreign Trade
- C. Settlement Management replaces ERP SD Rebates
- D. SAP Revenue Accounting replaces ERP SD Revenue Recognition
- E. SAP order Fulfillment replaces ERP SD Availability Checking
Answer: B,C,D
NEW QUESTION 35
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production cost collector
- B. Repetitive manufacturing profile
- C. Production version
- D. Routing
Answer: C,D
NEW QUESTION 36
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By creating routings with parallel sequences
- B. By assigning the same production version to different materials
- C. By creating routings with alternative sequences
- D. By assigning different materials to the same routing
Answer: D
NEW QUESTION 37
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied from the picking list.
- B. The planned order's component availability is checked
- C. The planned order is converted to a production order.
- D. The planned order generates capacity requirements.
Answer: D
NEW QUESTION 38
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:
- A. SAP MaxAttention
- B. SAP Best Practices
- C. Guided Configuration
- D. Premium engagement
Answer: B,C
NEW QUESTION 39
......
Top SAP C-TS422-1909 Courses Online: https://www.vce4dumps.com/C-TS422-1909-valid-torrent.html