Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

Last C_TS413_2021 practice test reviews Practice Test SAP dumps [Q13-Q36]

Share

Last C_TS413_2021 practice test reviews: Practice Test SAP dumps

Try C_TS413_2021 Free Now! Real Exam Question Answers Updated [Jan 08, 2024]

NEW QUESTION # 13
Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question.

  • A. Orders always need to be combined with notifications
  • B. More than one operation must always be maintained in the maintenance order.
  • C. Notifications are used for documentation of technical findingsand activities performed.
  • D. Orders and notifications can be utilized in combination
  • E. Maintenance orders can be created as immediate orders without any planning.

Answer: C,D,E


NEW QUESTION # 14
Which objects can a personnel number be assigned to directly?Note: There are 2 correct answers to this question.

  • A. Business partner
  • B. Equipment
  • C. Planner group
  • D. Work center

Answer: A,B


NEW QUESTION # 15
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question.

  • A. When an order is created based on a single notification, this notification becomes the header notification.
  • B. The long text of the reference notification can be automatically copied as the long text of the order.
  • C. The document within the document management system canbe assigned only at operational level.
  • D. The assignment of the header notification to an order CANNOTbe deleted.

Answer: A,B


NEW QUESTION # 16
Which material type is the best choice if you only want to create a structure element within the BOM?

  • A. Operating supplies (HIBE)
  • B. Spare part (ERSA)
  • C. Non-valuated material (UNBW)
  • D. Maintenance assembly (IBAU)

Answer: D


NEW QUESTION # 17
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?

  • A. An entry in the object list
  • B. An activity in the notification header
  • C. A text in the subject long text screen
  • D. A task in the notification item

Answer: B


NEW QUESTION # 18
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.

  • A. SAP Work Manager
  • B. SAP Asset Manager
  • C. Worker safety applications
  • D. SAP Predictive Maintenance and Service

Answer: B,D


NEW QUESTION # 19
In which component do you have to perform most of theconfiguration to set up SAP Asset Manager?

  • A. SAP Cloud Platform
  • B. SAP Mobile Platform
  • C. SAP ERP
  • D. SAP S/4HANA

Answer: A


NEW QUESTION # 20
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Scheduling indicator
  • B. Scheduling period
  • C. Call horizon
  • D. Lead float

Answer: B


NEW QUESTION # 21
Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

  • A. Documents
  • B. Permits
  • C. Work approval
  • D. Work clearance documents

Answer: A,B


NEW QUESTION # 22
Which of the following is a prerequisite for external refurbishment?

  • A. Select the material group for externally refurbished materials.
  • B. Activate the subcontracting indicator in an external activity.
  • C. Create the purchasing info record for the external provider.
  • D. Define the order type for external refurbishment.

Answer: B


NEW QUESTION # 23
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. SAP QuickViewer
  • B. SAP Lumira
  • C. SAP Crystal Reports
  • D. Plant Maintenance Information Systems (PMIS)

Answer: B,C


NEW QUESTION # 24
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection document as PRT to the task list operation.
  • B. Assign a piece of equipment with an allocated measuring point to a task list operation.
  • C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
  • D. Assign an inspection lot to the task list header.

Answer: B,C


NEW QUESTION # 25
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

  • A. Configuration
  • B. Warranty
  • C. Serial data
  • D. Manufacturer data

Answer: A,C


NEW QUESTION # 26
What is the function of the print diversion setting?

  • A. It tells the system that a shop paper for an order is ready to be printed.
  • B. It enables you to define which shop papers are printed as a system default.
  • C. It enables you to determine which papers are printed for the technician.
  • D. It enables you to chose a printer based on certain fields in the order.

Answer: D


NEW QUESTION # 27
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

  • A. Start marker
  • B. Object network
  • C. Unit of measure
  • D. Segment
  • E. Type of offset

Answer: A,C,E


NEW QUESTION # 28
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

  • A. Purchase order
  • B. Service entry sheet
  • C. Goods movement
  • D. Invoice

Answer: C


NEW QUESTION # 29
Which SAP UI technology is used for the technicianls job list?

  • A. SAPUI5
  • B. Web Dynpro
  • C. SAP GUI for Windows
  • D. SAP GUI for HTML

Answer: B


NEW QUESTION # 30
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Call object
  • B. Maintenance activity type
  • C. Change documents
  • D. Completion date
  • E. Order type

Answer: A,D,E


NEW QUESTION # 31
Which statements are correct for standard processes in PM/PS costcontrol? Note: There are 2 correct answers to this question.

  • A. Budget can be assigned to a WBS element.
  • B. Budget can be assigned to a maintenance plan.
  • C. Maintenance order costs can be settled to a WBS element.
  • D. Maintenance costs can be settled to a network operation.

Answer: A,C


NEW QUESTION # 32
In which of the following locations can object information can be found

  • A. Din master record of technical object
  • B. In Order
  • C. In Notification
  • D. In document

Answer: B


NEW QUESTION # 33
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

  • A. It defines which data is transferred to the lower levels of the hierarchy.
  • B. It defines the allowed characters for a functional location.
  • C. It defines hierarchy levels of the functional location structure.
  • D. It can have a maximum length of 50 characters.

Answer: B,C


NEW QUESTION # 34
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.

  • A. The usage of a model service specification is mandatory.
  • B. The actual value entry can only be recorded via the service entrysheet.
  • C. The assignment of service master records to an order operation is optional.
  • D. The assignment of a control key with the service indicator set is mandatory.
  • E. The assignment of a control key with the service indicator set is mandatory.

Answer: B,D,E


NEW QUESTION # 35
What is a valid partner type within the partner determinationprocedure?

  • A. Purchasing group
  • B. Purchasing organization
  • C. Vendor (external)
  • D. Business partner (gen.

Answer: D


NEW QUESTION # 36
......

Get Ready to Pass the C_TS413_2021 exam with SAP Latest Practice Exam : https://www.vce4dumps.com/C_TS413_2021-valid-torrent.html

Get Prepared for Your C_TS413_2021 Exam With Actual SAP Study Guide!: https://drive.google.com/open?id=1PeIN-D8lv4L3Bw7J0kRxwrlVdTQPz4U4