
Free SAP (C_TS422_2504) Certification Sample Questions with Online Practice Test
C_TS422_2504 Certification Study Guide Pass C_TS422_2504 Fast
NEW QUESTION # 25
You are trying to create a production order and no valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
- A. The basic start date is NOT within the validity period of the production version.
- B. No bills of material (BOMs) are assigned to the production versions.
- C. No production lines are assigned to the production versions.
- D. The order lot size is NOT within the validity range of a production version.
Answer: A,D
NEW QUESTION # 26
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a delivery address
- B. Changing an operation time
- C. Changing a dependent requirement
- D. Changing a storage bin
Answer: B,C
NEW QUESTION # 27
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.
- A. Scheduling of an operation takes place as close as possible to the desired date.
- B. Sequencing on multiactivity resources is automatically updated.
- C. Changes are automatically implemented in the complete collective order.
- D. Neighboring operations can be moved in both directions in order to create a slot.
Answer: A,C
NEW QUESTION # 28
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (pool) chart
- C. Order (dispatched) chart
- D. Capacity requirements chart
Answer: A,D
NEW QUESTION # 29
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use the batch whereused list.
- B. Use the Batch Information Cockpit.
- C. Use batch determination.
- D. Use batch derivation.
Answer: A,B
NEW QUESTION # 30
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Market intelligence
- B. Past quotation quantities
- C. One-off events
- D. Past sales order quantities
- E. Past production planning quantities
Answer: A,C,D
NEW QUESTION # 31
Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.
- A. Select master data.
- B. Define integration with cost accounting.
- C. Schedule production orders.
- D. Check material availability.
Answer: A,B
NEW QUESTION # 32
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Float after production
- C. Setup time
- D. Opening period
Answer: B,C
NEW QUESTION # 33
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Post the goods receipt for the finished product.
- B. Post production costs to the planned order.
- C. Create associated capacity requirements.
- D. Update statistics for the Business Information Warehouse.
- E. Reduce run schedule quantities.
Answer: B,C,E
NEW QUESTION # 34
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Plant
- D. Material
Answer: B,D
NEW QUESTION # 35
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.
- A. Setup time
- B. Queue time
- C. Teardown time
- D. Move time
Answer: B,D
NEW QUESTION # 36
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.
- A. Add the agreement to the source list mark it for MRP relevance.
- B. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- C. Add the agreement to the quota arrangement mark it for MRP relevance.
- D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Answer: A,D
NEW QUESTION # 37
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Routing
- D. Material master
Answer: B,C
NEW QUESTION # 38
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Routings
- B. Production order
- C. Work center
- D. Bill of material
Answer: A,D
NEW QUESTION # 39
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?
- A. Specify a negative offset time.
- B. Specify a negative planning horizon.
- C. Specify a negative PP/DS horizon.
- D. Specify a negative opening period.
Answer: A
NEW QUESTION # 40
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. ATP quantities
- C. Planned orders (unfirmed)
- D. Production orders
Answer: A,D
NEW QUESTION # 41
What are the key features of using a low level code? Note: There are 2 correct answers to this question.
- A. To determine the use of subitems inside material BOM (bill of material)
- B. To determine how costs are rolled up by product costing
- C. To determine the sequence in which materials are planned in MRP
- D. To determine the priority of alternative components inside ATP
Answer: B,C
NEW QUESTION # 42
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material master
- B. Select a special procurement type inside the material BOM (bill of material)
- C. Select a special explosion type inside the material master
- D. Select a special explosion type inside the material BOM (bill of material)
Answer: A,B
NEW QUESTION # 43
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
- C. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
- D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
Answer: B
NEW QUESTION # 44
......
SAP C_TS422_2504 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
Get Perfect Results with Premium C_TS422_2504 Dumps Updated 89 Questions: https://www.vce4dumps.com/C_TS422_2504-valid-torrent.html
C_TS422_2504 Dumps PDF 2026 Program Your Preparation EXAM SUCCESS: https://drive.google.com/open?id=15ujMs3QWPmsQ04p7LHXS4Nbs8tBe9Q2I